Instructions / Assembly

Instructions for Use | 4
STEP 1:
prep
Inspect your Floorigami material prior to installation. Contact us at 1.844.742.7429 if a
visible manufacturing defect exists. If such a defect is installed, Shaw is not liable for the
installation.
A proper installation depends on the proper site conditions. The following conditions
must be maintained for 24 hours prior to, during and permanently after installation:
HVAC System: Must be operational maintaining the following conditions.
Temperature: The installation site, carpet and adhesive must be between
50° F and 95° F.
Humidity: The installation site’s ambient relative humidity should not fall
below 40%.
The existing hard surface floor must be structurally sound, clean, level and dry before
you begin.
Sweep your floors and ensure they are free of dust, dirt, oil, grease, paint, curing agents,
concrete sealers, loosely bonded toppings, loose particles and any other substance or
condition that may prevent or reduce adhesion.
Plywood Subfloors: Floors must be Wood Association Approved and primed with a paint
roll application of liquid latex such as Shaw 9050 floor primer.
Concrete Subfloors: Fill depressions or cracks by using a gypsum-based patching and/or
leveling compound containing Portland or high alumina cement that meets or exceeds
the compression strength of 3,000 PSI.
YOU’LL NEED: Broom