Use and Care Manual

it’s what’s underneath that counts®
Installations Instructions
floormuf f ler.com
1 800 440 6008
Let’s get social
1. Start in a corner with the tape strip side next to the wall and the overlapping film
toward the open room.
2. Install
f loorMuf f ler® UltraSeal
(film side down) parallel to the wall in the
opposite direction that you plan to install the flooring planks.
3. When installing the
f loorMuf f ler® UltraSeal,
leave at least 2” going up the wall.
1. Be sure to unfold the film, extending it 3” from the foam.
2. Roll out the next roll of
f loorMuf f ler® UltraSeal
in the same manner, making
sure that the foam seams are butted together.
3. Be sure to overlap only the moisture barrier lip and not the foam pad.
1.
Remove the adhesive liner
and adhere the foam to the film overlap
1.
Install the flooring
per manufacturer’s instructions.
1
2
3
4
5
FLOOR MUFFLER® ULTRASEAL HD
1. Make sure the subfloor is structurally sound, level and is free of dust and debris.
2. Check for protruding nails and/or defects in the subfloor. If installing over
concrete, the concrete must be dry with moisture emission rates that do not
exceed
3 lbs. per 1000 square feet per 24 hours
as measured by the
Anhydrous
Calcium Chloride Test.

Summary of content (1 pages)