Installation Guide
Page 18 of 36 versatile™ 4C Installation Manual -- 206362 -- Rev A
www.orencemailboxes.com
INDIVIDUAL INSTALLATION
1 . 
For Double-Wide Florence 4C Modules:
A. Open the right master door until the hold open arm engages and install the included 
#8 x 2” pan-head T20 Torx wood screws (64225) along the right-hand outer frame.
B. Partially open the left master door until the right master door can be completely closed.
C. Open the left master door until the hold open arm engages and install the included #8 
x 2” pan-head T20 Torx wood screws (64225) along the left-hand outer frame.
D. With both the left and right master doors open and hold open arms engaged, install 
the included #8 x 2” pan-head T20 Torx wood screws (64225) along the top and 
bottom frame.
NOTE: Only front-loading tenant or tenant with parcel units have a hold 
open arm.
•  When installing a rear-loading module, parcel-only module, 
collection box module, or trash/recycling bin, you may ignore all 
references to hold open arm(s) in the remainder of the text.
NOTE: The #8 x 2” pan-head T20 Torx wood screws (64225) should 
be tightened to ensure a snug fit.
•  Overtightening beyond initial contact with frame could 
hinder functionality.
•  If overtightening occurs, simply back out each 
overtightened mounting screw.
versatile™ 4C mailbox suites










