Instructions / Assembly

Assembly Instructions
visit:
12” -24”
18”
LEVEL LINE
FIND STUDS
LEVEL LINE
LEVEL LINE
3A
2A
1A
3B
2B
1B
STUD LOCATION
1. Locate Studs / Level Line
(recommended creating guide lines) (recommended 8 screws per 4’ panel)
4. Horizontally Mounting
(use dowels to connect boards )
5. Vertical Mounting
(overlap boards)
6. Attatching End Caps
(Left Edge start from bottom / Right Edge start from top)
Orientation Options
(Using 6 Boards)
2. Align Board to Studs and Level Line
3. Mount Board to Studs
(recommended 12 - FLOW 2” Screws)
1775 W 2300S
Salt Lake City, UT 84119
(877) FLOWWALL - (877) 356-9925
register your purchase so we can keep you updated with all of our new
products and special offers.
Stud Locations
16”
Stud Locations
16”
Stud Locations
16”

Summary of content (1 pages)