Manual

14of16 MN301035 RevB
INSTALLATION StepNine
The LD34 / LD35 series are designed to operate while submerged in the actual
applicationliquid.Avoidinstallingtheleveltransmitteralongthebottomofthetankas
materialssuchassludgewillbuildupandcoat/coverthetransmitter.Thisalsoincludes
anydebristhatwillsettlealongthebottomofthetank.Intheseapplications,itisbest
tosuspendthetransmitterabovethehighestlevelofsludge/debristhatwilloccur.
1. Location:Selectalocationwherethetemperatureofthetransmitterwillbe
between0and176°F(18to80°C).Distancefromthereceiverislimitedonlyby
totalloopresistance.
2. Position: The transmitter is not position sensitive. However all standard models are originally
calibrated with the unit in a position with the pressure connection downward. Although they can be
used at other angles, for best accuracy it is recommended that units be installed in the position
calibrated
atthefactory.
3. Mounting: The transmitter can be mounted via several methods.It can be suspended from the
electrical cable, or it can be placed resting on the bottom of the tank in either horizontal or vertical
orientation.
Interference:TheDeltaSpan™isdesignedtooperateunderthesurfaceoftheliquidin
thetank.Avoidinstallationswhereothertankrequirementswillcausethetransmitter
tomoveorswing.Forexample:amixerbladecouldcausetheleveltransmittertowhip
aroundwithinthetank.Analternativewouldbetomovethetransmittertoamore
stablesectionofthetank
ortoinstalltheLD34/LD35seriesinsideastillwell/droptube.
Thestillwell/droppipewillminimizetheeffectscreatedbythemixer.
Termination:ThecablefortheDeltaSpan™istypicallyterminatedatajunction box
locatedontopofthetank.Sincetheventtubeiscontainedwithinthecable,the
pressurewithinthejunctionboxmustalwaysbethesameasthereference(typically
atmospheric)pressurefortheliquid.Theinsideofthejunctionboxmust beclean,dryandfreeofmoisture.
Addtheoptionalpressurefitting(LD90_001)tocompletethepackage.TheLD90_001
featuresa2”NPTthreadformountingandaliquidtightconnectortosealthecable
interface.
Note:Use caution whensealingthe cable atthe topof the tank.The ventilationtube
must be open and free to allow air to flow back to the pressure diaphragm.Avoid
blocking the ventilation
tube by compressing the cable.Always keep the cable
termination clean, dry and free of moisture and prevent liquid from entering the vent
tube.
Note:A vent Filteris provided on the endof the venttube.If the application requires
theventtubeto becuttolength,thenremovetheventfilterandplaceontheendofthenewendofthevent
tube.
Note:For extra protectionagainst highhumidityenvironments,FlowlineofferstheLD903000desiccantfilter
thatcanbeattachedtotheventtube.