User's Manual

805/805 FC
Users Manual
8
Power On
Push to turn on the Meter. See Table 3 for the control
location.
Note
Before you use the Meter for the first time, install
the new batteries (see Battery Replacement on
page 38).
When the Meter is turned on, the default Measurement
screen shows on the Meter.
gqi49.jpg
Power Off
A soft shutdown is the preferred method to turn off the
Meter:
1. Push .
2. At the prompt, select Yes.
3. Or, select No to continue with operation.
If the Meter locks up or becomes inoperable, a hard
shutdown can be used to turn off the Meter:
Note
Use a hard shutdown only as a last recourse as it
can cause data loss. After a hard shutdown, start
the Meter and verify the data in Memory.
1. Push and hold for more than 2 seconds.
2. Push to restart the Meter.
If Meter does not restart or the problem persists,
contact Fluke.