Instructions

Table Of Contents
Chapter 6: Sync Projects with LinkWare
Live
Use LinkWare Live Through a Wi-Fi Network
91
GPU190.EPS
Figure 31. SYNC PROJECTS Screen
These projects are only on the tester. They have not been
synced to LinkWare Live.
By default, the active project is selected to sync.
These projects and subprojects are in the LinkWare Live
organization shown (“QuickCable” in this example).
To update the list without syncing projects, tap , then tap
the LinkWare Live panel again.
D
E
A
B
C