Instructions
Table Of Contents
- DSX-600 Users Manual
- LIMITED WARRANTY AND LIMITATION OF LIABILITY
- Contents
- List of Figures
- Chapter 1: Get Acquainted
- Overview of Features
- Contact Fluke Networks
- Register Your Product
- Technical Reference Handbook
- Additional Resources
- Supplements and Updated Manuals
- Kit Contents
- Symbols
- Safety Information
- Connectors, Keys, and LEDs
- About Link Interface Adapters
- AC Adapter and Battery
- Verify Operation
- How to Use the Touchscreen
- Change the Language
- Buttons to Do Tests and Save Results
- Overview of Memory Functions
- Options for Cable IDs
- About LinkWare Applications
- Chapter 2: Certify Twisted Pair Cabling
- Chapter 3: Certify Coaxial Cabling
- Chapter 4: Manage Test Results
- Chapter 5: Use Projects
- Chapter 6: Sync Projects with LinkWare™ Live
- Sign Up for a LinkWare Live Account
- How to See the Tester’s MAC Address
- Use LinkWare Live Through a Wired Ethernet Network
- Use LinkWare Live Through a Wi-Fi Network
- When You Cannot Sync a Deleted Project
- About the Asset Management Service
- Change the Network Settings
- Sign Your Tester Out of LinkWare Live
- Sign In to LinkWare Live from a Desktop or Mobile Device
- Import Projects from LinkWare Live into LinkWare PC
- Learn More About LinkWare Live
- Chapter 7: Maintenance
Chapter 4: Manage Test Results
Delete, Rename, and Move Results
73
To delete results
1 On the MANAGE RESULTS screen, select the results you want
to delete.
To select all the tests that failed or all the tests that passed,
tap Select All Retests or Select All Passes.
2 Tap DELETE, then tap DELETE in the confirmation dialog.
To rename results
1 On the MANAGE RESULTS screen, select one result to rename.
2 Tap RENAME.
3 Enter a new name, then tap DONE.
To move results to a different project
1 On the MANAGE RESULTS screen, select the results you want
to move.
2 Tap MOVE.
To move the results to a project shown in the list, tap the
project name, then tap MOVE in the confirmation dialog.
To make a new project and move the results to the new
project, tap NEW PROJECT, enter a project name, tap
DONE, then tap MOVE in the confirmation dialog.
Note
When you move results to a different project, that
project becomes the active project.