User Manual
Table Of Contents
- IntelliTone Pro Users Manual
- LIMITED WARRANTY AND LIMITATION OF LIABILITY
- Contents
- Overview of Features
- Registration
- Contacting Fluke Networks
- Unpacking
- Safety Information
- Battery Status
- Auto Power Down
- Locating and Isolating Terminated UTP/STP Cables with the IntelliTone
- Isolating Individual Wire Pairs with the SmartTone Analog Function
- Validating RJ11 and RJ45 Cable Maps
- Validating the Cable’s Shield
- Validating Ethernet Service
- Testing for Continuity
- Maintenance
- Specifications
IntelliTone Pro
Users Manual
10
Validating the Cable’s Shield
To use the probe’s SYNC LED for shield validation during
cable map tests, do the following:
1
Remove the battery door and disconnect the battery
from the probe, as described under “Battery Life and
Replacement” on page 13.
2
Turn the probe’s rotary switch to CABLE MAP.
Note
The battery must be disconnected from the probe
fo
r at least 30 seconds.
3
Replace the battery and battery door.
The SYNC LED will now indicate a good, open, or shorted
shield as described in the previous section.
To disable shield validation via the probe’s SYNC LED, do
the following:
1
Remove the battery door and disconnect the battery
from the probe.
2
Turn the probe’s rotary switch any position except
CABLE MAP.
Note
The battery must be disconnected from the probe
f
o
r at least 30 seconds.
3
Replace the battery and battery door.