Operation Manual
Versiv Cabling Certification Product Family
Users Manual
152
TEST: Tap TEST to do the test shown in the test setup panel.
The percentage of the tests in the project that are completed.
The tester uses the number of available IDs and the tests you
selected on the CABLE ID SETUP screen to calculate this
percentage. See Figure 86 on page 215. % Tested does not
show if your project contains only a Next ID list. See “About
Next ID Sets” on page 217 for more information about the
Next ID list.
The type of module attached to the tester. If no module is
attached, this screen shows HOME.
Settings for OTDR Tests
Table 7 gives descriptions of the settings for OTDR tests. To set up
a project, which includes the settings in Table 7, cable IDs, and
operator names, see Chapter 11.
To set up an OTDR test
1 On the home screen, tap the test setup panel.
2 On the CHANGE TEST screen, select an OTDR test to change,
then tap EDIT.
Or to set up a new OTDR test, tap NEW TEST then tap a Test
Type.
3 On the TEST SETUP screen, tap the panels to change settings
for the test. See Table 7.
4 On the TEST SETUP screen, tap SAVE when your test setup is
completed.
5 On the CHANGE TEST screen, make sure the button next to
the test is selected, then tap USE SELECTED.