Case Studies

This story features a regional
wastewater treatment plant on
the shores of Puget Sound,
Washington. An award-winning
facility serving six cities, the
plant processes an average of
2
1
.1 million gallons of waste-
water daily, with a daily
capac
ity of up to 28.7 million
gallons
.
Most water treatment facili-
ties use the same basic
proc
esses, but this one has
been continuously updated
since it opened in 1984, includ-
ing high-intensity U
V light and
soon, a new Class “A” biosolids
dr
ying fac
ility.
Application Note
Clean power delivers
clean water
From the Fluke Digital Library @ www.fluke.com/library
Measuring tools: Fluke 434 Power
Quality Analyzer
Features: Power factor, harmonics
Power
Quality
Case
Study
In this particular case, main-
tenance electrical specialist
Mark Newport was in the
process of installing new elec-
tronic power factor correction
units at multiple motor control
centers (MCCs) to improve
power quality, protect equip-
ment and reduce costs.
However, since corrective
measures can often introduce
new power quality problems
into the system, he used a
handheld Fluke 434 three-
phase Power Quality Analyzer
to make sure their efforts were
successful.
S
y
stem details
The treatment plant relies on
hundreds of motors, some as
large as 500 hp. A SCADA
c
ontrol system is interfaced to
the M
C
Cs, as well as valves,
actuators, sensors, and power
monitors. It also allows instant
v
isibility into the system at
numerous stations.
If the plant went down for
any reason, such as a regional
power outage, sewage would
continue to flow through the
plant and though the sedimen-
tation tanks, but it would be
discharged into Puget Sound
without full treatment.
To prevent this from ever
happening, the plant electrical
system has several levels of
redundancy. It’s served by dual
utility feeds from two substa
-
tions. Generally the load is
shared between the two feeds,
but either feed can handle the
whole facility through a tie-
breaker system
. A 1.25 MW
generator on an automatic
transfer switch can take over
within 8 seconds, if both utility
feeds fail
. Small, single-phase
uninterrupted power supplies
(UPS) maintain the elements of
the redundant control system
while the generator starts and
synchs.

Summary of content (4 pages)