User's Manual

DPC/TRACK
Users Manual
B-6
V
RTD
MEASSOURCE
mA mA
RTD
V
300V
MAX
30V MAX
TC
Jumper Wire
ED004F.EPS
Figure B-3. Test Setup
9. You can confirm that the jumper wires are properly attached if the “Source”
and “Measure” values are nearly identical; they should both be exactly (or
very nearly) 1 Volt.
10. To begin the automated test, select Softkey #2. The calibrator will now
source and measure our three testpoints of 1, 3, and 5 Volts (since we
originally defined them to be, respectively, 0%, 50%, and 100% of our input
range, which was 1-5 Volts).
11. When the test is done, the results will be displayed on the screen. To continue,
select Softkey #4.
12. The Tag ID and SN (Serial Number) values for our test (which are
SAMPLETAG6 and SN4, respectively) should now be displayed. Select
Softkey #4 two more times to continue.
13. You should now see the wrapup message “This is a Wrapup Message.” Select
Softkey #4 to continue.
We are now ready to transfer our test results back to the DPC/TRACK system.
(See Step 9 within Example 2.4.)