Measure and mark two bottom mounting holes on the wall corresponding to the Use drill bit per-drilled hole locations in the bottom for drywall anchor install amounting bar. son. Use a 1/8 in. 3mm) drill bit for direct stud installation. NOTE: if installing into a material other than drywall or into stud, consult a professional for proper installer horizontal line connecting the two bottom elation. marked location.the line should to be level. adjust to level if necessary.
Va Install the top bar hanger with the same way as the bottom bar So follow the mounting instruction B seeder for the adjustable shelves, unscrew a adjust the position of 1 shelf directly and then tighten the screw for mixed. A => adjustable glass shelves Put the cabinet on the bottom bar hanger and hold the cabinet, please make sure that the hanger must mach the track from the bottom board of the cabinet .
RECESS MOUNT INSTRUCTIONS NOTE: Rough opening is not an exact measurement. The extra space allows cabinet to be inserted into the opening. Add shims to level and tighten space if necessary. Additional framing might be required. 1 NOTE: Before cutting the rough opening,check for pipes, electrical cables, or heating ducts. If it is required to remove part of stud, make sure that the wall is not a load bearing wall. Prepare the opening in the wall for the cabinet body.
SHELF ADJUSTMENT For your convenience, adjustable shelves have been per-installed. In order to adjust shelf location: @ Carefully slide the shelf out from shelf clips. See fig.1. €} Loosen each shelf clip screw (two for each shelf) and slide to the desired location.See fig 2. € Carefully slide the shelf into the shelf clips making sure shelf is level and re tighten shelf clip screws. fig.