Fireplace Manufacturers Inc Stove User Manual

www.fmiproducts.com
113084-01L 13
INSTALLATION
Continued
PRESSURE TESTING HEATER GAS
CONNECTIONS
1. Open equipment shutoff valve (see Figure
11, page 12).
2. Open main gas valve located on or near
gas meter for natural gas or open pro-
pane/LP supply tank valve.
3. Make sure control knob of heater is in the
OFF position.
Figure 12 - Checking Gas Joints
(Oxford™ Stove Model Shown)
Control Valve Location
Propane/LP
Supply Tank
Equipment Shutoff Valve
Figure 13 - Checking Gas Joints
(Oxford™ Stove Model Shown)
Gas Meter
Equipment
Shutoff Valve
Control Valve Location
4. Check all joints from equipment shutoff
valve to control valve (see Figure 12 or
13). Apply a noncorrosive leak detection
uid to gas joints. Bubbles forming show
a leak.
5. Correct all leaks at once.
6. Light heater (see Operation). Check all
other internal joints for leaks.
7. Turn off heater (see To Turn Off Gas to
Appliance, page 15).
Figure 14 - Assembling Rod and Screen
Rod
Rings
Slot on Inside
Left Front of
Stove
Figure 15 - Installing Screen Into Stove
(View From Back of Stove)
Hole on Inside
Right Front of
Stove
Rod with
Screen
Assembled
1. Insert rod through small rings located at
top of screen (see Figure 14).
2. From back of stove, insert rod into hole
located inside right front of stove as shown
in Figure 15, page 13.
INSTALLING ROD AND SCREEN
3. Slip left side of rod down into slot on
inside left front of stove (see Figure 15,
page 13).