Quick Start Manual
BIN • RIDE Technology self-contained
11
➊
➋
➊
➋
• Insert potable water line into valve
➊
• Push drain line over hose barb on back of
evaporator mount
➋
Potable water and drain lines
7. 7
In
Out
• Install ice machine cooling water lines to
louvered docking assembly
Cooling lines
7. 5
➊
➋
• Slide ice machine into louvered docking
assembly
➊
• Insert ice transport tube into coupling and
tighten nut rmly
➋
Ice transport tube
7. 6
Valve is preset at factory.
Do not adjust.
Adjustment will void warranty and may damage equipment.
ATTENTION INSTALLER
➋
➊
• Connect cooling water lines to ice
machine
➊
• Water valve is set at the factory. DO NOT
remove seal or adjust water valve
➋
Cooling lines and power
7. 8
Water-cooled ice machines – follow steps 7.5 through 7.10.