Quick Start Manual

7
BIN • RIDE Technology self-contained
Install the louvered docking assembly.
Louvered docking assembly
4
1" (25,4mm)
Stub Typ
3" (76mm)
1-3/4" (44,5mm)
3" (76mm)
3/8˝
high pressure
line
1
000, 1400:
5/8" low pressure line
1
650:
7/8" low pressure line
Mount louvered docking assembly
“Rough-in the refrigerant piping
2.1
Louvered docking assembly
4.1
Mount louvered docking assembly to wall
bracket accessory
Wall bracket accessory
Mount louvered docking assembly to
machine stand accessory
Machine stand accessory