Installation Instruction

14
self-contained HARMONY • TOP-MOUNT
Connect louvered docking assembly to ice
machine.
7
Internal connections
Air-cooled ice machines – follow steps 7.1 through 7.5.
CAUTION
Plug must be accessible after nal installation.
H_E1410A/W 230/50/1 requires a 20A circuit (4.00 mm
2
wire)
Remove twist tie
Carefully pass cord thru opening and plug
into wall outlet
For H_E units, install a suitable plug
Power cord
7. 3
Slide ice machine into louvered docking
assembly ensuring that drain tube is fully
seated on barbed drain tting
Insert ice transport tube all the way into
coupling and tighten nut rmly
Ice transport tube
7. 1
Insert potable water line into valve
Potable water and drain lines
7. 2
Position plate into opening and secure
with supplied screw
Power cord
7. 4