Installation Instructions

6
self-contained DROP-IN • RIDE Technology
12"
(304,8mm)
min.
4"
(101,6mm)
Hot Water
160 F (71 C)
Prepare the dispenser.
3
Dispenser preparation
Determine best route for ice transport tube run. Note: 12" (304,8mm) clearance is required.
Drill 1 3/4" (44,5mm) hole through either side of dispenser
Install gasket
onto bulkhead tting
Attach bulkhead tting with at up
and tighten bulkhead nut
Position and secure nut locking plate
with supplied screws
Verify installation of O-ring on stainless steel ice transport tube coupling
Insert stainless steel ice transport tube coupling
into bulkhead tting and secure with coupling
cap
Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with pliers
before making connection to ease assembly
Attach ice transport tube to coupling with supplied hose clamp
2.1
Dispenser preparation
3.1