Installation Instructions for Remote Condensing Unit

7
REMOTE CONDENSING UNIT
Phase monitor adjustments (if necessary)
2.4
1. Use a meter at the phase monitor to ensure there is voltage across all three phases and note
the voltage value.
2. The Restart Delay
should be set to 200 (seconds).
3. The Voltage Adjustment (VAC)
should be set to match the voltage value from Step 1.
3. The Trip Delay
should be set to 7 (seconds).
PLEASE NOTE THAT ANY TIME POWER IS APPLIED TO THE CONDENSING UNIT, OR THE
UNIT COMES OUT OF A FAULT STATE, IT WILL TAKE APPROXIMATELY 200 SECONDS FOR
THE UNIT TO POWER ON.