Installation Instructions for Remote Condensing Unit
7
REMOTE CONDENSING UNIT
Phase monitor adjustments (if necessary)
2.4
1. Use a meter at the phase monitor to ensure there is voltage across all three phases and note
the voltage value.
2. The Restart Delay
➊
should be set to 200 (seconds).
3. The Voltage Adjustment (VAC)
➋
should be set to match the voltage value from Step 1.
3. The Trip Delay
➌
should be set to 7 (seconds).
PLEASE NOTE THAT ANY TIME POWER IS APPLIED TO THE CONDENSING UNIT, OR THE
UNIT COMES OUT OF A FAULT STATE, IT WILL TAKE APPROXIMATELY 200 SECONDS FOR
THE UNIT TO POWER ON.