User Manual

19
8
8
.
.
R
R
E
E
C
C
E
E
I
I
V
V
E
E
R
R
I
I
N
N
S
S
T
T
A
A
L
L
L
L
A
A
T
T
I
I
O
O
N
N
8
8
.
.
1
1
P
P
r
r
e
e
p
p
a
a
r
r
a
a
t
t
i
i
o
o
n
n
1) Flat Head Screwdriver (- )
2) Phillips Head Screwdriver (+)
3) Multi-Meters
4) 14 mm Wrench X 2
5) Power Drill with 10.5 ~ 11mm Drill-Bit
6) Output Cables
1. Ensure receiver is not set to the same channel and ID code as any other units in
operation at the same facility within 300 meters/900 feet.
2. Prior to installation, make sure that the crane system itself is working properly.
3. Use the multi-meter to check the voltage source available and ensure receiver voltage
setting is correct for this voltage.
4. Prior to installation, switch off the main power source to the equipment.
8
8
.
.
2
2
S
S
t
t
e
e
p
p
B
B
y
y
S
S
t
t
e
e
p
p
I
I
n
n
s
s
t
t
a
a
l
l
l
l
a
a
t
t
i
i
o
o
n
n
1. Select a suitable location to mount the receiver.
2. The location selected should have the antenna visible from all areas where the
transmitter is to be used.
3. The location selected should not be exposed to high levels of electrical noise.
4. Ensure the selected location has adequate space to accommodate the receiver enclosure.
5. The distance between the antenna and the control panel should be as far apart as
possible.
5. Drill four holes on the control panel (10.5mm).
6. Tightened all screws provided.
7. For system wiring, please refer to the wiring diagram located on the last page of this
manual and on the backside of the receiver cover plate.
8. Ensure all wiring is correct and safely secured and all screws are fastened.