Instructions / Assembly

11
Left Hand Assembly
Right Hand Assembly
STEP 9
1. Install roller(11) on outer door(3), then tighten with spanner.
2. Install threshold gasket(17) at the bottom of outer door(3).
3. Cut water-retaining gasket(18) with 4 3/4"(120mm) at the top part
(see picture 3).
4. Install water-retaining gasket(18) on outer glass(3).
11
17
2
1
18
13
11
17
18
4
11
17
2
1
18
13
11
17
18
4
Lagoon Double Roller Door
Customer Service 1-888-620-3667
STEP 9
1. Install roller(11) on outer door(3), then tighten with spanner.
2. Install threshold gasket(17) at the bottom of outer door(3).
3. Cut water-retaining gasket(18) with 4 3/4"(120mm) at the top part
(see picture 3).
4. Install water-retaining gasket(18) on outer glass(3).
Outside
Outside
4 3/4"
18
3
120mm
4 3/4"
18
3
120mm