Instructions / Assembly
STEP 2: CHOOSE POSTS
Determine the correct post type for each post locaon - Line Post, End/Gate Post or Corner Post. It may be
helpful to drop each post at the appropriate stake to avoid confusion during installaon.
Wall mounts (sold separately) are required when mounng the panel to a wall or masonry.
LINE POST CORNER POST END/GATE POST
STEP 3: POST, GATE & PANEL INSTALLATION
For the easiest installaon, we suggest installing each post and panel in a sequenal manner.
Starng with the first post, remove the stake from the ground and dig a hole measuring approximately 8” in
diameter and around 22“ deep in the stakes place. Once the hole is dug, posion the post in the hole and check
to make sure the pre-cut holes are facing the direcon the panels will be installed. Using a hammer and a block of
wood (to protect the post) hammer the post into the ground approximately 2” so the post is 24“ below ground
level. This will provide stability when pouring concrete and aaching the panel to the post.
TIP: Measure 24” from the boom of
the post and mark with chalk or a
temporary marker to ensure proper
height placement. The 24” mark on the
post should align with ground level.