Instruction Manual
1
A. Turn oven control switch to 500F and pull out the knob
B. Use the screwdriver to spring the regulating screw for 1.5 rounds as per the picture indication.
C. Put back the knob
STEP 6: Reconnect Gas and Electrical Supply
Leakage testing of the range shall be conducted according to the installation instructions provided with the range.
Before operating the range after the gas conversion, always check for leaks with a soapy water solution or other acceptable
method at gas connections installed between the gas inlet pipe of the range, gas regulator, and the manual shut-off valve.
WARNING DO NOT use a flame to check for gas leakage.
STEP 7: Installation of LPG Conversion Label
Record the model and serial number on the LP / Propane Conversion Label provided in this kit.
The information can be obtained from the existing Rating / Serial label. Place the LPG conversion label as close as possible
to the existing Rating / Serial label on the range.
Preparation
Before moving the range, protect any finished flooring and secure oven door(s) closed to prevent damage.
The oven door(s) can be removed to lighten the load or to fit the unit through a doorway. Only remove if necessary. Do not
remove the griddle or any other component. Door removal should only be done by a certified installer or service technician.
Placement
Do not lift or carry the oven door by the door handle.
Use an appliance dolly to move the range near the opening. Remove and recycle packing materials. Do not discard the
anti-tip bracket supplied with the range.
Leveling
Raise the range to the desired height by adjusting the legs. The legs can be adjusted by rotating clockwise to raise or
counter clockwise to lower the rang.
Anti-Tip Bracket
Regulating screw