User Guide

QUICK START GUIDE
Automatic lamb feeder
5.1 Installation checklist
This document provides a brief overview of what to consider when installing a lamb feeder.
Connect water
1
Connect power
2
Establish ground connection
3
3
Auto
press to stop Automatic mode
Hint: button
*
press to start Automatic mode
**
1
Open hose ttings
4
This checklist refers to the basic equipment of the Lamb Feeder. Not all available functions can be shown.
For detailed information and valid warnings as well as safety instructions, please refer to the instructions manual. (Status 21/07)
Feeding station - suction hose
5
ca. 40 cm
ca. 10 cm
suction hose length max. 2 m [6,5‘]
Install the teat at its
intended location on the
front plate.
Mount the suction hose hol-
der for cleaning - higher than
the mixer position and near
the suction points.
40cm [1,3‘] above
the lamb‘s oor
ca. 10 cm
[0,33‘]
MP
6
Fix protection grid and ll the
powder hopper
New setup
Start
C
and
Press and hold
ON
All values set back to factory settings. Boiler is lled.
7
Fill boiler
8
Auto
Adjust target temperature
9
Auto
Set
Select temperature with
+
-
*
**
Adjust portion size - Water
10
Auto
Set
Start
Water amount
per portion
+
Repeat till desired amount is reached
=
Auto
*
**

Summary of content (2 pages)