Installation Guide

INFINITY TECHNICAL GUIDE
Info@FortressDeck.com
www.FortressDeck.com
1-844-909-4999
19/27 063016
11.6 Installation: Modern Rail Stair
●Buildingcodesareveryspecicontheallowableanglesandwidthsofopeningsbetweenpostsforstairapplications.Always
consult your local building codes prior to installation.
●PostsshouldbeinstalledpriortoinstallingtheInnityModernRails.
●PlacetheInnityModernRailsonthestairsbetweenthetwoposts,spanningaminimumofthreestairstodeterminethedesired
angle.(11.6A)
●MarktheInnityModernRailswiththecorrectdimensionsandcuttothedesiredlength.(11.6B)
●Note: Test the Innity Modern Rails between posts for
accuracy of t prior to marketing the baluster positions.
●Oncerailshavebeencuttothedesiredlength,placetop
andbottomrailssidebysideandmarkforaccuratebaluster
placement. NOTE: Baluster spacing must be less than 4”.
(11.6C)
●Oncebalusterspacinghasbeenproperlymarked,pre-drill
holesforfastenersusingabitslightlysmallerthanthefastenerto
ensure a secure connection.
11.6A 11.6B
11.6C