Sol-Ark Integration Guide

Rev 2.1 09-14-21
Fortress Power - Sol-Ark Inverter Guide
505 Keystone Rd, Southampton, PA 18966 . (877) 497 6937. sales@fortresspower.com . Fortresspower.com
Introduction
Battery Datasheets / Manuals: See Downloads section of individual product pages
Email: techsupport@fortresspower.com
Discord Support: https://discord.gg/kxX6QMjKFw
Phone: (877) 497-6937 x 2
Hours: 9:00AM - 6:00PM EST Use Discord for After Hours / Weekends
Warranty Submittal: https://www.fortresspower.com/warranty/
Step 1 Getting Started. Turn each battery on individually while unpacking the batteries and note the voltage
of each battery as well as the serial numbers. The batteries must be within +/- 0.5V of each other before
commissioning. Turn off the batteries and install in parallel. Install the battery-to-battery communication cables and
proceed with system commissioning.
Pro tip: If the battery voltages are significantly different, wire the batteries in parallel without communication cables
and only turn on the lowest voltage battery. Use the inverter or external charger to charge the battery to the
voltage of the 2
nd
lowest battery. Turn the 2
nd
battery on and charge the battery bank to the 3
rd
lowest battery
voltage. Repeat until all batteries are at the same voltage. Keep total charging voltages under 15A per battery during
this process.
Pro tip: If the batteries are just slightly outside the +/- 0.5V range, you can avoid using an inverter or an external
charger to balance the batteries by only turning the lowest voltage batteries on (ONLY if within 0.5V relative to each
other) and allowing those batteries to balance. Repeat this process with the highest voltage batteries. This brings
the lowest and highest voltage battery towards to the middle of the group.
Pro tip: It is not usually necessary to apply a firmware update to Fortress batteries during system commissioning,
but our installer firmware update tool can help speed up commissioning times.
Step 2 Update Sol-Ark Firmware. Power up the Sol-Ark from grid, generator, or batteries. This step can be
done during pre-commissioning while running the batteries in “master only” mode, ahead of installing the battery
communication circuits. Set up Wi-Fi with Sol-Ark Inverter using Sol-Ark’s PowerView App (search for Powerview in
the app store, but it is called PV Pro) and have your site name and Wi-Fi dongle serial number handy. Call Sol-Ark at
(972)-575-8875 and request a firmware update. This process can take up to 60 minutes. You may want to take a
picture of your firmware version so you can tell when the firmware update is complete.
Pro tip: If a BMS error occurs when powering up the inverter, turn the batteries off. Connect the inverter and any
battery breakers so that power can flow from the batteries to the inverter. Turn the batteries back on again. Then
power up the inverter again. You may need to repeat this process up to three times to pre-charge the inverter
enough for it to power up.