Installation Guide
14 © 2019 Fortress Framing, LLC Rev6-10/10/19
Beam Canlever: Distance the beam overhangs out past the support post. The maximum beam
canlever allowed with Evoluon Steel Framing is 24".
Beam Span: Distance between support posts. This span varies based on the overall joist span as
well as the joist canlever. Reference the Beam Span Charts contained within this instrucon
manual.
Joist Spacing: On-Center (O.C.) spacing typically 12" O.C. or 16" O.C. from center of one joist to center
of the next joist. This spacing is determined based on desired overall joist spans. Reference the Joist
Span charts contained within this instrucon manual.
Joist Canlever Span: Distance the Joist spans overhang out past the beam. Note that this distance
impacts beam and joist spans and is referenced in the Span Charts.
Joist Span: Distance the joist spans from the S-Ledger to the beam, or from beam to beam.
Preparaon & Planning
Special Note: The maximum
beam canlever allowed with
Evoluon Steel Framing is 24”
D
E
C
B
A
E
E