Installation Guide
35 © 2019 Fortress Framing, LLC Rev6-10/10/19
Surface Mount Post—Deck Rim Connued
Post to Frame Connecons
Finish installing bolts on the boom side with 3/8” galvanized washers and nuts.
BOTTOM VIEW
Hand ghten the bolts and nuts unl snug. Some deformaon of the framing member is normal to get a solid
connecon but DO NOT over-ghten.
Blocking
(2x6 Joist)
5-7/8 in. x 5-7/8 in. x
1-1/2 in. 12 Gauge
Angle Bracket
3/8” x 8” Galvanized
Nuts, Bolts, Washers
3/8” x 8” Galvanized Nuts,
Bolts, Washers
U-Rim Joist