Installation Guide
38   © 2019 Fortress Framing, LLC   Rev6-10/10/19
Thru-Mount Post 
Post to Frame Connecons 
Cut blocking using the Evoluon 2x6 Joist. Posion and install blocking so the post will t snug between the 
U-Rim Joist and the cut 2x6 blocking piece. Install with 5-7/8 in. x 5-7/8 in. x 1-1/2 in. 12 Gauge Angle Bracket 
using the Evoluon Self-Drilling Screw. 
Using a Step Bit and Drill, cut out 2 holes large enough to t a 9/16” socket and extension. These will be used 
as access points to aached the thru-bolt. 
Using a drill and a 3/8” x 8” long drill bit, drill thru-holes that go thru the blocking, post, and the U-Rim Joist. 
Insert 3/8” x 4” bolt and washer thru the drilled holes. Hand ghten the washer and 3/6” nut to the 3/8” bolt. 
This is the installaon for a wood or steel thru post.  
Using the 9/16” socket and ratchet, aach to the bolt thru the hole opened up with the step bit. 
Aached a 9/16” wrench to the nut on the opposite end and ghten. Hand ghten unl snug. 
TOP VIEW 










