Installation Guide

EVOLUTION
TM
STEEL DECK FRAMING
13
Fig. 8
2X

Apply 

FRAMING CONNECTIONS
S-Ledger To Structure
 

2. 

 
 
Fig. 11.
 
structure. 


engineer to determine the proper size and type of bolt/

 3/8”
[10mm] 
All pre-drilled holes should be used

 
The
notched side of the F-50 Bracket is designed to line up
