Instructions / Assembly

Installation Instructions for
Cutting Fortress Fence Products
Note
It is the responsibility of the installer to meet all code and safety requirements as well as obtain all required building
permits. The installer should determine and implement appropriate installation techniques for each installation situation.
The Fortress Company and its distributors shall not be held liable for improper or unsafe installations.
For technical assistance, please email: technicalhelp@fortressfence.com
Hours of Operation: Monday through Friday 8:00 AM to 5:00 PM, CST
Phone: 1-866-323-4766 Fax: 972-644-3720
www.fortressfence.com
Required Materials
Metal Cutting Saw, File, Brush or Rags, Cardboard, Fortress Zinc Based Touch-Up Paint.
Read Instructions Completely Before Starting Installation
Not following the below steps could result in oxidation at cut points and will void the warranty. When cutting Fortress Fence
Products, complete the following at cut points:
• Cut material to length and remove all metal shavings from the cut area
• File any sharp edges left by cutting. Thoroughly wipe and remove any filings, grime or dirt from the panel.
Apply two coats of Fortress zinc based touch-up paint to the cut area. If touch up is at rail ends, allow paint to dry before
connecting bracket to post.
• Be sure to remove any metal shavings from the work surface to prevent on the surface.oxidation
Fortress Fence Products can be
cut with a reciprocating saw
Fortress Fence Products can
be cut with a cut-off saw
File or sand cut edges so that
they are smooth
Remove any metal shavings and dust
with a brush or rag. Make sure
surfaces to be painted are clean.
Using a piece of cardboard as a mask.
Apply the 1st coat of Fortress Zinc
Based Touch-Up Paint. Allow to dry
before applying second coat.
1st Coat 2nd Coat
Using a piece of cardboard as a mask.
Apply the 2nd coat of Fortress Zinc
Based Touch-Up Paint. Allow to dry
and install.
072412

Summary of content (1 pages)