Instructions / Assembly
10
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
4’[1219mm]opening
betweenStairPost
HOUSE/BUILDING
Fig. 1
Step 1: Sketch Railing Post Layout
1. Determinedesiredpostlocaons.Includestairpostsif
complengstairinstallaon.
2. Usingatapemeasure,determinetherequiredspacing
betweeneachpost.Provided6’[1829mm]panel
maximumpostspacingis69-3/4”[1772mm].It is
recommendedtolayoutposttoallowforminimalrailing
panelcuts.
3. Foraacheddeckinstallaon,EndPostsclosesttowall
shouldbeposioned4"[102mm]fromoutsidefaceof
S-Ledger.
4. Sketchthedesiredpostlayout.
Note:
• AllPostsshouldbeposionedtoallowforeachpostbase
throughbolttopenetratePostBlocking,JoistorU-Rim.
Referencedeckkitframinginstrucons.Adjustpost
posioningifneeded.
• Openingbetweenstairpostsshouldbe4’[1219mm].
TOP VIEW
End
Post
Line
Post
Corner
Post
69-3/4”[1772mm]
maximumpostspacing










