Instructions / Assembly

23
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
6. UseHULKMetalCompositeDeckScrewstofasteneach
endofthedeckboardontotopfaceofstairframe.
ReferenceFig.28&29forrecommendedfastenerspacing.
7. Posionsecondcut SquareEdgeDeckBoardushwiththe
sidefaceofthestairtrayandspaced1/8"[3mm]fromthe
rstboard.AsshowninFig.30.
8. RepeatStep1:3-6.AsshowninFig.31-35.
9. RepeatStep1:1-8toinstallSquareEdgeDeckBoards
onto remainingstepsinstairframe.AsshowninFig.36.
Note:
Itisrecommendedtomark47-7/8”[1216mm] on Square
EdgeDeckBoardpriortocung.Besuretocutalongthe
cutlinetopreventtolerancestackfrombladethickness,
leavingthelastboardshort.Lengthofstairtreadisactually
tobe47-7/8"[1216mm].
• Mounted SquareEdgeDeckBoardoverhangwillvary
basedonrise/runofstairframe.
Fig.23
Fig.24
Top View
47-7/8”[1216mm]
Square Edge Deck Board
Cutboardush
withbackofStair
Trayandcentered
acrossthewidth
oftheStairTray