Instructions / Assembly
29
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
INSTALLATION: Al
13
PLUS RAILING POSTS
Step 1:
1. PosionEnd,LineandCornerPostsindesiredposionon
decksurface.AsshowninFig.44or45.Forstair
installaon,ONLY posionpoststobeusedattopofstair,
boomstairpostswillbemountedinlatersteps.
2. Posiontheedgeofeachpostbaseplate1"[25mm]from
PictureFrameDeckBoardedges.AsshowninFig.46.
3. Conrmpostspacing.6’[1829mm]panelmaximumpost
spacingis69-3/4”[1772mm].AsshowninFig.47.DO NOT
exceedthemaximumpostspacing.Adjustasneeded.
4. Forwallmountedinstallaon,bothEndPostsshouldbe
posioned3-7/8"[98mm]fromS-Ledger.Asshownin
Fig.48.
Note:
• Referencedeckkitframinginstruconsforpostblocking
posioning.
through bolts should penetrate post blocking.
• Referencedeckkitframinginstruconsforpostblocking
instrucons.
Al
13
PLUS3"[76mm]
Postwithmounted
UB-04brackets










