Instructions / Assembly

39
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
Step 3: Top Bracket of Top Post 
1. Posionwood2”x4”(actual1-1/2”x3-1/2”[38mmx
89mm]) on stairs in line withboombrackets.Asshownin
Fig.72.
2. Placepanelontopofwood2”x4”[60mmx
102mm]nexttoboombrackets.AsshowninFig.73.
3. Rakethepanelunlbalustersareparalleltotheposts.
4. Clampthepaneltothepost.Besuretoclampatfour
touchpointstokeeppanelinposion.AsshowninFig.74.
5. Posiontopbracketcenteredandatonpost.

of rail. As shown in Fig. 75.
6. Usepenciltomarktopedgeofbracketlocaononpost.
7. Disassemblethebracketbyremovingthebarrelandscrew.
8. Placebracketbaseonprevioustopedgemark.
Centerthebaseonthepostandusepenciltoaddmarks
fortwoscrewholelocaons.AsshowninFig.76.
Note:
Forbestresults,besurebracketbasesarecenteredon
postswhenmakingmarks.

Fig. 73