Instructions / Assembly

42
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
Fig. 79
PostToBaluster
SpaceMustBe
LessThan4”
[102mm]
Fig. 78
Clamp
Clamp
Clamp
Clamp
Fig. 77
Top View
1/2"[13mm]
Oset
6. Placeboompostindesiredposion.Measurespacing
frominsideedgeofposttotherstpicketinpanel.
Spacing CANNOT exceed4”[102mm]onbothtopand
boomposts.AsshowninFig.79.Adjustboompost
posioningasneeded.

1. Markboltholelocaonsanddrilla7/16”[11mm]hole
throughboardandstepassembly.AsshowninFig.80&81.
2. DismountStairstepfromStairKitassembly.Asshownin
Fig.82.
3. MeasureinternalopeningbetweentheStairBrackets.As
showninFig.83.
4. CutU-RimJoisttomeasuredlength.
5. InsertcutU-RimJoistinopeningbetweenStairbrackets
thenuseC-Clampstoholdinplace.Asshownin
Fig.84&85.
6. Extendpre-drilledholesthroughcutU-RimJoist.Asshown
inFig.86.