Instructions / Assembly

46
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
INSTALLATION: Al
13
PLUS STAIR RAILING PANEL
Step 1: Measure & Mark Panels Where Cuts Will Be Made
1. Posionwood2”x4”(actual1-1/2”x3-1/2”[38mmx
89mm])onstairsinlinewithboomandtopbrackets.
2. Placethepanelontopofwood2”x4”(actual1-1/2”x
3-1/2”[38mmx89mm])nexttoboombrackets.
3. Havethepanelrakedandasclosetonalinstallaon
posionaspossible.
4. Conrmthatpanelislevel.
5. Placecutmarkingonrailsinlinewiththebackofbracket
opening.Besureboomofbracketandboomofrailare
ush.AsshowninFig.90.
6. Usespeedsquaretoensuremarkingsareperpendicularto
panel.
AdjustableStairPanel
StairAngle
Maximum40
o