Installation Guide
10
Step 2:
Recommended Post
3048mm].
•
•
Step 3:
1.
• Fortress recommends using the
2. Mark the center of Guide String cross points.
3.
4. D
markings using a Post Hole Digger.
5. Be sure to keep the Post Hole Digger straight and plumb
6.
Guide String along Post footprint
Stake
Frame Footprint
10’ [3048mm]
10’ [3048mm]