Installation Guide

32
DECK & STAIR KIT INSTALLATION: APEX DECKING & Al
13
PLUS RAILING
Step 3: Mount Posts
1. Insert3/8”x8-1/2”[10mmx216mm]HexHeadbolts and
washersthroughpre-drilledholes.AsshowninFig.51.
2. Fasten nutsandwashersontoboltsonboomofframing.
AsshowninFig.52.
Fig.51 Fig.52
Step 4: Check Mounted Posts
1. Shimpostasneededtoensurepostislevel.
Fig.53 Fig.54

U-Rim
Shimpostas
needed to ensure
postislevel
JoistBlocking
Joist