Installation Instructions

10
a. Press bottom brackets onto the bottom rails. Slide
all four (4) brackets into bracket bases which are
connected to the posts.
b. Slide bracket covers onto the bases and loosely
secure in place with provided hinge bolts (Fig. 12).
a. Pre-drill the top rail at the bottom stair post using the
bracket holes as a guide (Fig. 13).
b. Drive two (2) 1
5
5
5
8
8
" painted pan head screws up
through the holes locking the bracket, panel and top
rail together. Once the top rail is secured, tighten all
four (4) of the hinge bolts to lock stair panels in place.
Install pyramid post top onto each post (Fig. 14).
NOTE:
A rubber mallet may be needed for a proper  t.
NOTE:
Angle rail installation uses a combination of
features used in both the rail and stair
applications. This installation will use the same
bracket base of the stair brackets and similar
components, while using the preset layout of the
installation template for quick and easy installation.
Angle rail brackets must be purchased separately.
Angle rail mounting varies greatly on each
installation.
9
10
11
1
Bottom Rail
Pre-drill
Pre-drill
Pre-drill
Pre-drill
Fig. 12
Fig. 13
Fig. 14
Pyramid Top
Post
ANGLE RAIL INSTALLATION