Installation Guide

4
1
2
3
Vinyl Cement
Upright
Assembly
Vinyl Cement
Fig. 3
a. Apply provided vinyl cement to all inside surfaces of
the uprights where the rails will be installed (Fig. 3).
b. Attach uprights to rails (Fig. 4).
Lay gate components on a smooth,  at and clean
surface. Begin by arranging the rails in the correct
orientations.
For Styles With Two Rails:
a. Slide the pickets into the bottom rail. If pickets are
numbered, follow the sequence from left to right (Fig. 1).
b. Slide the top rail over the pickets (Fig. 2).
For Styles With Three Rails:
a. Slide the pickets into the bottom rail. If pickets are
numbered, follow the sequence from left to right (Fig. 1).
b. Slide the middle rail over the pickets.
c. Slide the top rail over the pickets (Fig. 2).
Fig. 1
Fig. 4
Fig. 2
1
Bottom Rail
Pickets