Installation Guide
4
3
4
Fig. 4
Fig. 5
a. Insert top and bottom rails into top and bottom post
hole routes of both posts (Fig. 4).
b. Starting from the left side, insert pickets/boards down
through the top rail. Finish by locking pickets/boards
into bottom rail (Fig. 5).
NOTE:
Scalloped and arched panels have pickets/boards
that are numbered. Start from left side with #1
picket/board rst.
Fig. 6
Plumb and level second post and add concrete according
to manufacturer's instructions to top of post hole (Fig. 6).