Installation Guide

5
Install Support Brace:
a. Two support braces are included with 6' railing
kits. For code purposes, only one is required for
installations in the U.S., while both are required in
Canada. Spread out the braces proportionately (Fig.
11).
b. Four support braces are included with 8' railing
kits. For code purposes, only two are needed for
installations in the U.S., while all four
are required in
Canada. Spread out the braces proportionately.
Rails to Posts:
a. Bring assembled rails between posts, elevated
above brackets assembled in Step 2.
b. Once centered, slowly lower rail assembly carefully
to allow full engagement between section and
brackets in all four locations on posts (Fig. 12).
NOTE:
The top top rail pro le should rest on the
bottom of the bracket that is screwed
into post.
c. Attach brackets to rails – Pre-drill two holes from
under the bottom of the top rail through rail.
Complete for each top rail bracket. Drive
#8 x 1
1
1
1
2
2
" Pan Head screws (2 per bracket) through
drilled holes.
Install pyramid post top onto each post (Fig. 13).
NOTE:
A rubber mallet may be needed for a
proper  t.
Fig. 11
Fig. 12
Fig. 13
Pyramid Top
Post
5
6
7