Installation Guide

8
Install Support Brace:
a. Two support braces are included with 6' railing
kits. For code purposes, only one is required
for installations in the U.S., while both are
required in Canada. Spread out the braces
proportionately (Fig. 11).
b. Four support braces are included with 8' railing
kits. For code purposes, only two are needed
for installations in the U.S., while all four are
required in Canada. Spread out the braces
proportionately.
Rails to Posts:
a. Bring assembled rails between posts and line
up with installed bases. While holding section
with brackets in between the installed bases
(From Steps 2a-c), pre-drill through the top
holes on back of brackets with
9
9
9
32
32
" drill bit, and
connect brackets to bases with
1
1
1
4
4
" sex bolts
provided (Fig. 12).
b. Attach top brackets to top rails – Pre-drill
two holes from under the bottom of the top
rail through rail. Complete for each top rail
bracket. Drive #8 x 1
1
1
1
2
2
" Pan Head screws
(2 per bracket) through drilled holes.
c. Attach bottom brackets to bottom rails – Drive
#8 x
3
3
3
4
4
" Pan Head screws (1 per bracket)
through side of bottom rail bracket into
bottom rail.
Fig. 12
Install pyramid post top onto each post (Fig. 13).
NOTE:
A rubber mallet may be needed for a
proper  t.
Fig. 13
Pyramid Top
Post
Fig. 11
5
6
7