Installation Guide

5
Once posts are set, place 2" spacer blocks to
support bottom rail (Fig. 10).
2"
Fig. 10
Place bottom rail inside the posts, resting it on the
2" spacer blocks (Fig. 11).
TIP:
The rail may need to be inserted at an angle in
one post to start before resting it fully on the
blocks and in both posts.
Fig. 11
Pre-drill rail using a
1
1
1
8
8
" drill bit. Attach bottom rail
using two
3
3
3
4
4
" Hex Head screws. Bottom screw
should be
3
3
3
4
4
" from the bottom of the bottom rail.
Screws should be 2" apart from each other. (Fig. 12).
Fig. 12
2"
3
3
3
4
4
"
Back out the top screw so that the channel is clear
until in ll boards are installed (Fig. 13). Repeat Steps
7 & 8 on other post.
Fig. 13
6
7
8
9