Installation Guide

3
2
2
2
2
1
2
3
4
Lay gate upright on a smooth, at and clean surface.
Slide upright inserts inside ends of gate uprights (Fig. 1).
Apply vinyl cement to all inside surfaces of the rst
upright where the rails will be inserted (Fig. 2).
Insert both rails into one upright assembly (Fig. 3).
a. Place the U-channels on the end boards, then slide
boards into rails, locking them together (Fig. 4).
b. Apply vinyl cement to all inside surfaces of the
second upright where rails will be inserted.
c. Attach the remaining upright assembly to the rails
making sure boards t snug.
Gate Upright
Upright Insert
Fig. 1
Vinyl Cement
Upright
Assembly
Fig. 2
Upright
Assembly
Rails
Fig. 3
Fig. 4
U-Channel
Boards
U-Channel
Measure diagonally from top of left corner rail (A) to
bottom of right corner rail (B) and note the length. Then,
measure diagonally from top of right corner rail (C) to
bottom of left corner rail (D). Note the length. Make
sure both measurements are the same before installing
screws into uprights (Fig. 5).
Fig. 5
A
D
C
B
5