Installation Guide

6
For Open Top Panels with Pickets:
Attach middle rail into left side of post route only then
guide rail over boards. Insert top rail into left post route
holes of  rst post only (Fig. 14).
Insert pickets down through top and middle rail (Fig. 15).
NOTE:
Scalloped and Arched panels have pickets/boards
that are numbered. Start from left side with the #1
picket/board  rst.
Fig. 14
Fig. 15
Apply glue on inside rim of post tops then attach to
posts (Fig. 17). Repeat these steps until completed.
Fig. 17
Insert the completed fence panel into the route holes of
the second fence post. Plumb and level the post and add
concrete according to
manufacturers instructions to top
of hole (Fig. 16).
Fig. 16
13
14
15
16