Installation Guide

6
4
5
6
Fig. 6
A
D
C
B
Ensure gate is square. Measure diagonally from top of
left corner rail (A) to bottom of right corner rail (B) and
note the length. Then, measure diagonally from top of
right corner rail (C) to bottom of left corner rail (D). Note
the length. Make sure both measurements are the same
before installing screws into uprights (Fig. 6).
Install two 6" screws (provided) through each upright
insert and into the rail using the molded grooves on the
insert as a guide (Fig. 7).
Install upright caps onto the top of each upright with
remaining vinyl cement (Fig. 8).
Fig. 7
Fig. 8
7
8
Fig. 9
Screws
Upright
Attaching Boerboel
®
Hinge To The Upright:
a. Attaching the hinges to the inside of the gate
will allow the gate to open inward. When attaching
them to the outside, the gate will swing outward.
b. Mark and pre-drill
3
3
3
32
32
" pilot holes on top and
bottom upright. Secure using six 1
1
1
1
2
2
" screws (provided
with the hinge) to front and side of the upright (Fig. 9).
Repeat for the bottom hinge.
Fig. 10
Hold the gate level to the post, pre-drill holes with
3
3
3
32
32
"
bit and secure with six 1
1
1
1
2
2
" screws to the post (Fig. 10).
Repeat for the bottom hinge.
NOTE:
Use 2" blocks to align the gate with the fence and help
hold the gate steady (Fig. 11).
2" Blocks2" Blocks
Gate
Gate
Gate
Gate
Fig. 11