Installation & Assembly

1
DETAIL A
SCALE 1 : 4
8
9 2
Threaded Rod w/ Stop Nut
Parts List:
Step 1 (Recycled Post Only):
Fasten the Threaded Rod Support to the Recycled Post with the provided #12 Button Head Screws
and Security Driver. Make sure that the Threaded Rod Support is centered with the Post.
(The Threaded Rod Support is already preattached to Steel Posts)
Step 2:
Thread the Pagoda Bells Instrument Assembly's Threaded Rod into the Threaded Rod Support on the Instrument Post. Tighten
down until the Stop Nut makes contact with the Threaded Rod Support.
Step 3:
Take the 1/4"-20 Button Head Screw with Security Driver and thread it through the Threaded Rod Support all the way into the
Threaded Rod. This secures the Instrument Assembly so that it can not be backed out.
ITEM NO.
PART DESCRIPTION
In Ground -
Recycled Post/QTY.
In Ground -
Steel Post/QTY.
Surface Mount -
Recycled Post/QTY.
Surface Mount -
Steel Post/QTY.
1
Pagoda Bells Instrument Assembly
1 1 1 1
2
Threaded Rod Support
1 1 1 1
3
In Ground Recycled Post, 73"lg.
1
- - -
4
In Ground Steel Post, 73"lg.
-
1
- -
5
Surface Mount Recycled Post, 37"lg.
- -
1
-
6
Surface Mount Steel Post, 37"lg.
- - -
1
7
Surface Mount Base
- -
1
-
8
#12 Button Head Screw, 2.5"lg. SS, T25 tamp
4
-
4
-
9
1/4"-20 Button Head Screw, .5"lg. SS, T27 tamp
1 1 1 1
10
5/16" Hex Head Lag Bolt, 5"lg. SS
- -
2
-
11
3/8"-16 Wedge Expansion Anchor, SS
- -
4 4
12
35/64" Hex Nut Cap
- -
4 4
13
Security Driver
1 1 1 1
PROPRIETARY AND CONFIDENTIAL
THE INFORMATION CONTAINED IN THIS
DRAWING IS THE SOLE PROPERTY OF
FREENOTES HARMONY PARK. ANY
REPRODUCTION IN PART OR AS A
WHOLE WITHOUT THE WRITTEN
PERMISSION OF FREENOTES HARMONY
PARK IS PROHIBITED.
FREENOTES HARMONY PARK
194 BODO DRIVE, UNIT F
DURANGO CO 81303
TEL: (970) 375-7825
FAX: (970) 247-0856
WWW.FREENOTESHARMONYPARK.COM
SHEET 2 OF 4
TITLE:
SCALE: 1:16
REVISION: A
DATE: 2/9/2018
DWG. NO.
Parts List and Instrument to Post Installation
PBEL-INSTALL