Service and Parts Manual (2019, 2020, 2021, 2022)

Table Of Contents
43 PB
R-410A SEALED SYSTEM REPAIR
Pumping Down
Lo
Open
Purge the air
Outdoor unit
Indoor unit
Liquid side
Gas side
CLOSE
Open
2-Way
valve
CLOSE
3-Way
valve
Remove the valve stem caps and confirm that the valve stems
are in the raised position.
Be sure to use a hexagonal wrench to operate the valve stems.
Connect the charge hose with the push pin to the service port.
Open the low-pressure valve on the charge set slightly to air
purge from the charge hose.
Do this quickly so that the gauge ends up indicating 0-15 PSI.
Tighten the service port nut.
Be sure to check for gas leakage.